July 2026 update · Public validation snapshot and partner materials now available View update

GroundTruth AI Decision intelligence from Earth observation

Turn Earth observation into decisions you can defend.

GroundTruth AI combines optical, SAR, terrain, thermal and time-series evidence to rank where field teams should investigate first—and shows the uncertainty behind each priority.

Current statusTRL 4 · Controlled-environment validation complete; external pilot is the next gate.

Latest public evidence

0.888 Spatial-audit ROC-AUC · tunnel model Open summary
46,689points processed across two reproducible survey runs
17 / 17score reproductions without drift
149 / 149file-integrity checks passed
TRL 4validated in a controlled environment

01 / The decision gap

Imagery is abundant.
Decision confidence is rare.

Teams do not need another unexplained heatmap. They need a short list of investigation areas, the evidence behind each priority and a clear account of uncertainty and data gaps.

02 / The platform

A disciplined path from signal to field plan.

GroundTruth AI helps expert teams turn dispersed geospatial evidence into a ranked field plan. It narrows the search; field verification makes the decision.

Satellite sensing and layered subsurface evidence
01—05

Optical, radar, terrain and contextual evidence—reviewed together.

Landsat and Sentinel Earth observation coverage
01Assemble

Build the evidence base

Harmonize optical time series, SAR backscatter, terrain, thermal and approved partner layers.

Multi-sensor terrain analysis and validation controls
02Test

Stress-test generalization

Use spatial holdouts, coordinate controls, hard negatives and regional checks to expose brittle performance.

Three-dimensional ranked anomaly review
03Rank

Rank with context

Prioritize investigation areas using confidence, environmental fit and traceable contributing signals.

Evidence comparison prepared for expert review
04Act

Fit field workflows

Export GIS-ready layers, evidence tables, limitations and concise reports for expert review.

02.5 / Inside the platform

From regional signal to a reviewable field priority.

The workflow brings ranked areas, contributing evidence, uncertainty and provenance into one review path. The visualization shows multi-satellite Earth coverage; the protected demo uses non-sensitive data.

  • 01Define the missionConfirm the study area, model version and evidence coverage.
  • 02Review ranked areasMove from a regional mesh to a short list of candidate cells.
  • 03Keep the decision recordTrace contributing signals, uncertainty, limitations and provenance.

03 / Validation, not theatre

The score matters. The test regime matters more.

We publish each result with its validation setting—including promising transfer results and a negative holdout result that changed both our claims and next test.

Spatial audit · tunnel model0.888ROC-AUC

Performance under a spatially separated audit regime.

Country-out transfer0.846ROC-AUC

Evidence of transfer under a held-out country setting.

Strict geographic holdout · general model0 / 106held-out positives recovered

A useful negative result—not hidden, and not reframed as field accuracy.

Small blind sample3 / 4cases identified

Directional evidence only; the sample is too small for a broad claim.

What changed in the validation program

  1. 01

    Random splits were not accepted as final evidence.

    Evaluation moved toward spatial separation and country-out transfer.

  2. 02

    Reproducibility became a product requirement.

    Frozen artifacts, score reproduction and file integrity are tracked.

  3. 03

    Failure now shapes the next experiment.

    The general-model holdout result narrowed claims and strengthened the pilot protocol.

Important

These results demonstrate validation maturity within documented regimes. They do not establish commercial accuracy in a new geography. Independent, partner-led field validation is the next proof point.

03.5 / Regional-expert validation update

Nine regions. Three independent runs each. One preserved evidence trail.

The July 2026 evidence brief documents a repeatable regional-expert training stage. These internal ranges are reported separately from the spatial-audit and country-out regimes above.

Open the Proof of Evidence brief
Preserved model artifacts279 regions × 3 runs
Regional-expert AUC0.773–0.803controlled internal range
Regional-expert recall0.864–0.907controlled internal range
Global reference baseline0.653–0.700AUC range

Evidence boundaryLeakage controls passed in the internal record, but this is not yet an independent blind external test. Partner-held unseen outcomes remain the next proof.

04 / Mission architecture

One evidence core. Five focused mission areas.

Geospatial priorities over terrain
Recommended first wedge

Water & infrastructure intelligence

Prioritize where utility, geophysical and field teams begin inspection across large or sensor-sparse areas.

02

Environmental monitoring

Prioritize review of landscape change, heat, moisture and risk-oriented signals.

03

Land & engineering

Direct scarce ground-investigation capacity toward evidence-supported areas.

Connected global city observed by satellites
04

Infrastructure resilience

Support structured review across distributed assets and complex operating environments.

05

Cultural heritage

Support expert-led survey prioritization while protecting sensitive location data.

05 / Where the project stands

Internal evidence is documented. External field proof comes next.

01Complete

Technical foundation

Multi-sensor workflow, reproducible outputs and protected demonstration environment.

02Complete

Controlled validation

Spatial audit, country-out testing, integrity checks and documented limitations.

03Now

Partner pilot design

One bounded, non-sensitive area with a frozen protocol and independent review.

04Next gate

Toward TRL 5

Demonstration in a relevant environment, measured against an agreed baseline.

Partner pilot protocol

A result designed to survive scrutiny.

  1. 01Partner defines area and baseline
  2. 02Model, thresholds and protocol freeze
  3. 03Predictions lock before ground truth
  4. 04Independent review measures operational value
Discuss a partner pilot

06 / Updated public materials

Review the latest evidence, progress and partnership path.

All public documents below reflect the current 2026 project position and exclude sensitive locations, credentials and proprietary implementation details.

07 / Secure environment

Review the workflow in a protected environment.

The private mission console is available to approved partners, investors and technical reviewers. Access is protected on the server and sensitive code is not exposed.

Access private demo
Mission intelligence

Water & infrastructure intelligence

Operational challenge

Where should investigation begin?

Evidence brought together

A reviewable evidence stack

    Decision output

    A defensible field plan